Stormwater Pipe Liner Installation, Stormwater Pipe Liner Installation, DGC Environmental

Stormwater Pipe Liner Installation

We pumped about 90,000 gallons of water from one #stormwater system to another stormwater system on the same property to facilitate about 18,000 gallons for hot water recycling in a 36″ wide pipe. The pictures show the location, materials and most importantly, the pipe liner installation which makes this a viable solution.

 

Write a Comment

Your email address will not be published. Required fields are marked *