Did you receive a Notice of Violation (NOV)? Contact AQUALIS today to learn how to resolve the issue.

Back to Compliance
North Dakota Local Compliance

City of Valley City

At AQUALIS, we know Valley City's sustainable water compliance standards and manage regulator relations for our clients.

It is our mission to help you become compliant with these stormwater, wastewater and drinking water regulations through inspections, maintenance, repairs and rehabilitation services. As your water compliance provider, we handle the regulatory guidelines specific to Valley City, North Dakota and ensure that our services meet the highest compliant procedures to keep you in compliance with local regulators.

Last Updated 08/14/2026

Stormwater Code: Excerpts from Valley City, North Dakota, Code of Ordinance

Chapter 10.2- Stormwater Management Plan

Section 10-02-01- Application

A written application for stormwater management plan approval, along with the proposed stormwater management plan, shall be filed with the City Engineer. The application shall include a statement indicating the grounds upon which the approval is requested, that the proposed use is permitted in the underlying zoning district, and adequate evidence showing the proposed use will conform to the standards set forth in this title. Prior to applying for approval of a stormwater management plan, it is recommended that the applicant have the stormwater management plan reviewed by any affected public agencies.

Section 10-02-02- Contents of A Stormwater Management Plan

  1. Existing Site Map
  2. Site Construction Plan
  3. Plan of Final Site Conditions
  4. Stormwater Management Plan Report

Section 10-04-06- Stormwater Management Criteria for Permanent Facilities

  1. Pre-verses post hydrological response of the site
  2. Natural features of the site
  3. Stormwater management strategies
  4. Adequacy of outlets
  5. Stormwater detention/retention facilities

Chapter 10.05- Stormwater Management Permits

Section 10-05-01- Stormwater Management

It is unlawful to initiate land development activities that result in the increase in stormwater quantities or degradation of stormwater quality to any storm sewer system, open ditch or natural channel, water body, or wetland outlet within the jurisdiction of the city, without having first complied with the terms of this title.

Section 10-05-03- Final Stormwater Management Plan

Upon completion of all required construction activities, the permit applicant shall submit to the City Engineer the final stormwater management plan to document any change to the original stormwater management concept. The final stormwater management plan shall contain record drawings showing the final configuration for all improvements as constructed. The final stormwater management plan and record drawings shall be certified by a Professional Engineer registered in the State of North Dakota.

View State Page

Frequently Asked Questions

Record drawings are as-built documents showing exactly how the completed stormwater facility was constructed, which may differ from the original design. Valley City requires them as part of the final stormwater management plan submitted after construction wraps up.

AQUALIS coordinates the professional engineer certification and record drawings required for a property’s final stormwater management plan, confirms any additional post-construction maintenance obligations directly with the City Engineer, and helps property owners avoid violations of the ordinance’s prohibition on increased runoff or degraded water quality after construction.

The information on this page is provided for general informational purposes only and is not legal advice. Regulations change frequently — AQUALIS makes no warranty as to the accuracy or completeness of this content, and any reliance on it is at your own risk. Consult a qualified professional or your local regulatory authority to confirm requirements applicable to your specific property.

Services Offered in City of Valley City and Surrounding Area

retention pond and grass shore

Stormwater Management

AQUALIS provides comprehensive stormwater services across the United States. From inspection and maintenance to repairs and rehabilitations, AQUALIS manages water on your property so you do not have to.
lift station

Wastewater Management

AQUALIS offers sustainable wastewater solutions including inspection, maintenance and repairs.
Three people reviewing plans

Sustainable Water Engineering

AQUALIS provides sustainable engineering services, in states in which we are licensed, from concept through construction, working closely with our clients to identify and deliver their ideal solutions.
storm drain

Monitoring & Reporting

There are multiple requirements and records that need to be kept from your SWPPP to inspections and depending on your industry, stormwater sampling and analysis.
person holding a beaker

Water Quality Testing

AQUALIS offers water quality testing for stormwater, wastewater and drinking water.

Case Studies

From Diagnosis to Repair: How AQUALIS Solved a Repeat Erosion Problem No One Else Could in Wilmington, NC

With proper evaluation, AQUALIS developed a new engineering solution and performed a repair, serving as the single point of contact from diagnosis through construction.

Storm Pipe Repair and Rehabilitation in Delray Beach, Fla. 

A sinkhole in a Delray Beach roadway exposed a major failure in a 36-inch storm pipe. AQUALIS uncovered the pipe, identified an unexpected utility-related break and used a custom concrete repair to restore the stormwater system without replacing the otherwise sound pipe.

CIPP Lining and Structural Pipe Repair in Sebring, Fla.  

AQUALIS rehabilitated failing stormwater infrastructure at a commercial property in Sebring, Florida, using CIPP lining and structural pipe repair. Three pipe runs were lined, while two collapsed sections were excavated and replaced to restore the system.

Multiphase Stormwater Infrastructure Rehabilitation in Atl. GA

AQUALIS helped an Atlanta, Georgia property owner rehabilitate aging stormwater infrastructure through a phased approach. The project addressed critical repairs while allowing the owner to plan for future stormwater improvements.

How a Hidden Pipe Failure Created a Sinkhole and Pond Erosion at a Commercial Property in Orange City, Fla. 

A hidden stormwater pipe failure caused a sinkhole and pond erosion at a commercial property in Orange City, Florida. AQUALIS identified the damage through CCTV inspection and completed pipe and pond repairs to restore the stormwater system.

Lift Station Overhaul Restores Critical Sewage Infrastructure Tacoma, Wash.

AQUALIS completed a lift station overhaul for a critical wastewater system in Tacoma, Washington. The project replaced failing pumps, piping and electrical components, restoring reliable sanitary sewer service without disrupting terminal operations.
during construction of a new bridge in fox point, wisconsin

Green Infrastructure Protects Bridges in Fox Point, Wis.

Severe erosion threatened twin bridges spanning a ravine overlooking Lake Michigan. AQUALIS combined green and gray infrastructure to stabilize the slopes and protect critical infrastructure.

Comprehensive Lift Station Overhaul Restores Sanitary Service at Industrial Facility in Mount Vernon, Wash. 

After years of continuous service, an industrial facility's sanitary lift station had reached the end of its serviceable life. AQUALIS executed a full overhaul, replacing the pumps, plumbing, controls and in-well hardware to return the station to reliable, code-compliant operation.
Muffin Monster installation

Sanitary Lift Station Grinder Installation and System Reliability Improvement in Katy, Texas

AQUALIS addressed recurring sanitary lift station failures at a retail facility in Katy, TX, by identifying the upstream solids issue driving repeated emergency callouts. The project included installation of an inline Muffin Monster grinder, controls integration and full site restoration to improve system reliability and reduce reactive maintenance.
cut pipes laying in a parking lot

Parking Lot Sinkhole Leads to Underground Pipeline Reconstruction in Springfield, Va.

A large sinkhole at a commercial property in Springfield, Virginia led to full reconstruction of the site’s underground stormwater detention system. AQUALIS managed the phased demolition, geotechnical evaluation, utility coordination and installation to restore long-term stability and performance.
new catch basin

Manhole Root Intrusion Repair and System Assessment in Miami, Fla.

Sediment buildup, buried structures and root intrusion prompted a Miami shopping center to partner with AQUALIS to inspect, clean and restore key components of its stormwater system
uv light entering pipe

How Stormwater Pipe Inspection & UV Rehabilitation Restored Flow in New Bern, N.C.

A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.