At AQUALIS, we know Niagara's sustainable water compliance standards and manage regulator relations for our clients.

It is our mission to help you become compliant with these stormwater, wastewater and drinking water regulations through inspections, maintenance, repairs and rehabilitation services. As your water compliance provider, we handle the regulatory guidelines specific to Niagara, New York and ensure that our services meet the highest compliant procedures to keep you in compliance with local regulators.

Last Updated 08/21/2026

The Western New York Stormwater Coalition (WNYSC)

A number of communities in Erie and Niagara counties have joined together to develop a stormwater management program to protect our waterways and enhance our quality of life. About 45 towns, villages, and cities participate in the stormwater coalition. Forty-two municipal entities belong to the Western New York Stormwater Coalition. The Coalition’s Municipal Reference Guide lists the members and contact information for their respective Stormwater Management Programs.

The Western New York Stormwater Coalition (WNYSC) is a forum for these regulated communities to share resources and work in partnership toward compliance with the United States Environmental Protection Agency (U.S. EPA) Phase II Stormwater requirements. The overall goal of the Coalition is to utilize regional collaboration to identify existing resources and develop programs to reduce the negative impacts of stormwater pollution.

Niagara County’s plan for implementation of the USEPA minimum control measures is described in the County Stormwater Management Plan (SWMP), as required by the NYSDEC. The Model SWMP Plan written by the WNYSC has been modified to apply to the specific requirements for implementation by Niagara County. Some components that do not apply or are optional have been eliminated and other components modified as necessary to agree with the County’s Program.

Niagara County contains 10 MS4 communities in the NYSDEC Designated Areas;

  • Town of Cambria
  • Village of Lewiston
  • City of Niagara Falls
  • Town of Pendleton
  • Town of Wheatfield
  • Town of Lewiston
  • Town of Niagara
  • City of North Tonawanda
  • Town of Porter
  • Village of Youngstown.

Each of these municipalities is responsible for administering their own MS4 stormwater program.  Niagara County does not oversee the municipalities’ individual programs but works in association with these communities where County jurisdiction applies.

The SWMP Plan is based on the most current NYSDEC SPDES General Permit (GP-0-10-002) issued under the Federal Stormwater Phase II rule (issued in 1999) which requires MS4 owners and operators, in U.S. Census-defined urbanized or other designated areas, to develop a SWMP Plan. There are six program elements designed to reduce the discharge of pollutants to the maximum extent practicable. The program elements, titled Minimum Control Measures, include:

  1. Public Education and Outreach
  2. Public Involvement / Participation
  3. Illicit Discharge Detection and Elimination
  4. Construction Site Runoff Control
  5. Post-Construction Stormwater Management
  6. Pollution Prevention / Good Housekeeping for Municipal Operations.

Town of Niagara Stormwater Ordinance

CHAPTER 245. ZONING ARTICLE XIV. STORMWATER MANAGEMENT

B. Purpose. The purpose of this article is to establish minimum stormwater management requirements and controls to protect and safeguard the general health, safety, and welfare of the public residing within this jurisdiction and to address the findings of fact in §245-59A of this chapter. This article seeks to meet those purposes by achieving the following objectives:

(1) Meet the requirements of minimum measures 4 ands of the New York State Department of Environmental Conservation State Pollutant Discharge Elimination System (SPDES) General Permit for Stormwater Discharges from Municipal Separate Stormwater Sewer Systems (MS4s), Permit No. GP-02-02, or as amended or revised;

(2) Require land development activities to conform to the substantive requirements of the New York State Department of Environmental Conservation State Pollutant Discharge Elimination System (SPDES) General Permit for Construction Activities, Permit No. GP-0-10-001, or as amended or revised;

(3) Minimize increases in stormwater runoff from land development activities in order to reduce flooding, siltation, increases in stream temperature, and streambank erosion and maintain the integrity of stream channels;

(4) Minimize increases in pollution caused by stormwater runoff from land development activities which would otherwise degrade local water quality;

(5) Minimize the total annual volume of stormwater runoff which flows from any specific site during and following development to the maximum extent practicable; and

(6) Reduce stormwater runoff rates and volumes, soil erosion and nonpoint source pollution, wherever possible, through stormwater management practices and ensure that these management practices are properly maintained and eliminate threats to public safety.

Maintenance, inspection and repair of stormwater facilities

A. Maintenance and inspection during construction.

(1) The applicant or developer of the land development activity or their representative shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the applicant or developer to achieve compliance with the conditions of this article. Sediment shall be removed from sediment traps or sediment ponds whenever their design capacity has been reduced by 50%.

(2) For land development activities subject to§ 245-60 of the Town Code, the applicant shall have a qualified inspector perform site inspections in accordance with the New York State Department of Environmental Conservation State Pollutant Discharge Elimination System (SPDES) General Permit for Construction Activities, Permit No. GP-0-10-001, or as amended or revised.

B. Maintenance easement(s). Prior to the issuance of any approval that has a stormwater management facility as one of the requirements, the applicant or developer must execute a maintenance easement agreement that shall be binding on all subsequent landowners served by the stormwater management facility. The easement shall provide for access to the facility at reasonable times for periodic inspection by the Town of Niagara to ensure that the facility is maintained in proper working condition to meet design standards and any other provisions established by this section. The easement shall be recorded by the granter in the office of the County Clerk after approval by the counsel for the Town of Niagara.

C. Maintenance after construction.The owner or operator of permanent stormwater management practices installed in accordance with this article shall ensure they are operated and maintained to achieve the goals of this article. Proper operation and maintenance also includes, as a minimum, the following:

(1) A preventive/corrective maintenance program for all critical facilities and systems of treatment and control (or related appurtenances) which are installed or used by the owner or operator to achieve the goals of this article.

(2) Written procedures for operation and maintenance and training new maintenance personnel.

(3) Discharges from the SMPs shall not exceed design criteria or cause or contribute to water quality standard violations in accordance with § 245-63 of this article.

(4) Maintenance agreements. The Town of Niagara shall approve a formal maintenance agreement for stormwater management facilities binding on all subsequent landowners and recorded in the office of the County Clerk as a deed restriction on the property prior to final plan approval. The maintenance agreement shall be consistent with the terms and conditions of Appendix C of this chapter, entitled “Sample Stormwater Control Facility Maintenance Agreement.” The Town of Niagara, in lieu of a maintenance agreement, at its sole discretion, may accept dedication of any existing or future stormwater management facility, provided such facility meets all the requirements of this section and includes adequate and perpetual access and sufficient area, by easement or otherwise, for inspection and regular maintenance.

2010 Niagara County Stormwater Management Plan

5.1 Description of Minimum Control Measure

The Post-Construction Stormwater Management minimum control measure consists of Best Management Practices (BMP’s) that focus on the prevention or minimization of water quality impacts from new development and redevelopment projects that disturb greater than or equal to one acre, including projects less than one acre that are part of a larger common plan of development or sale that discharge into the MS4. The BMP’s describe structural and/or non-structural practices; the legal authority mechanism that will be used to address post-construction runoff from new development and redevelopment projects; and procedures to ensure long term operation and maintenance of BMP’s.

5.2 General Permit Requirements

An MS4 must, at a minimum:

a. Develop, implement, and enforce a program that:

i. provides equivalent protection to the NYS SPDES General Permit for Stormwater Discharges from Construction Activities (either GP-02-01, GP-0-08-001, or GP-0-10-001), unless more stringent requirements are contained in the MS4 General SPDES permit GP-0-10-002.

ii. addresses stormwater runoff from new development and redevelopment projects on or to County owned property from projects that result in a land disturbance of greater than or equal to one acre. Control of stormwater discharges from projects of less than one acre must be included in the program if:

  • that project is part of a larger common plan of development or sale; or
  • if controlling such activities in a particular watershed is required by the Department;
  • iii. includes enforceable mechanisms for post-construction runoff control from new development and re-development projects to the extent allowable under State law that meet the State’s most current technical standards:
  • through available mechanisms (i.e. tenant lease agreements, bid specifications, requests for proposals, standard contract provisions, connection permits, maintenance directives / BMPS, access permits, consultant agreements, internal policies);
  • procedures or policies must be developed for implementation and enforcement of the mechanisms;
  • a written directive from the person authorized to sign the NOI stating that updated mechanisms must be used and who (position(s)) is responsible for ensuring compliance with and enforcing the mechanisms for construction projects that occur on property owned by the covered entity or within the maintenance jurisdiction of the MS4; and
  • the mechanisms and directive must assure compliance with the requirements of the NYS SPDES General Permit for Stormwater Discharges from Construction Activities;

iv. includes a combination of structural or non-structural management practices (according to standards defined in the most current version of the NYS Stormwater Management Design Manual) that will reduce the discharge of pollutants to the MEP. In the development of environmental plans such as watershed plans, open space preservation programs, local laws, and ordinances covered entities must incorporate principles of Low Impact Development (LID), Better Site Design (BSD) and other Green Infrastructure practices to the MEP. Covered entities must consider natural resource protection, impervious area reduction, maintaining natural hydrologic conditions in developments, buffers or set back distances for protection of environmentally sensitive areas such as streams, wetlands, and erodible soils in the development of environmental plans.

  • If a stormwater management practice is designed and installed in accordance with the New York State Stormwater Management Design Manual or has been demonstrated to be equivalent and is properly operated and maintained, then MEP will be assumed to be met for postconstruction stormwater discharged by the practice;

v. establish and maintain an inventory of post construction stormwater management practices to include at a minimum practices discharging to the small MS4 that have been installed since March 10, 2003, those practices owned by the small MS4, and those found to cause water quality standard violations.

  • the inventory shall include at a minimum: location of practice (street address or coordinates); type of practice; maintenance needed per the NYS Stormwater Management Design Manual, SWPPP or other provided documentation; and dates and type of maintenance performed; and

vii. ensures adequate long-term operation and maintenance of management practices by trained staff, including assessment to ensure practices are performing properly.

  • The assessment shall include inspection items identified in the maintenance requirements (NYS Stormwater Management Design Manual, SWPPP, or other maintenance information) for the practice. Covered entities are not required to collect stormwater samples and perform specific chemical analysis;

viii. Covered entities may include the SWMP Plan provisions for development of a banking and credit system. MS4s must have an existing watershed plan based on which offsite alternative stormwater management in lieu of or in addition to on-site stormwater management practices are evaluated. Redevelopment projects must be evaluated for pollutant reduction greater than required treatment by the state standards. The individual project must be reviewed and approved by the Department. Use of a banking and credit system for new development is only acceptable in the impaired watersheds to achieve to no net increase requirement and watershed improvement strategy areas to achieve pollutant reductions in accordance with watershed plan load reduction goals. A banking and credit system must at minimum include:

  • Ensure that offset exceeds a standards reduction by factor of at least 2
  • Offset is implemented within the same watershed
  • Proposed offset address the POC of the watershed
  • Tracking system is established for the watershed
  • Mitigation is applied for retrofit or redevelopment
  • Offset project is completed prior to beginning of the proposed construction
  • A legal mechanism is established to implement the banking and credit system

b. Develop, implement, and provide adequate resources for a program to inspect development and re-development sites by trained staff and to enforce and penalize violators;

c. Develop, record, annually assess and modify as needed measurable goals; and

d. Select appropriate post-construction stormwater BMPs and measurable goals to ensure the reduction of all POCs in stormwater discharges to the MEP.

View State Page

Frequently Asked Questions

Post-construction stormwater management covers the ongoing responsibility to ensure proper operation and maintenance of stormwater facilities on your property, one of the six minimum control measures required under the Western New York Stormwater Coalition, which covers 42 municipal entities across Erie and Niagara counties. If your property in Niagara County is part of a development disturbing one acre or more, or part of a larger common plan of development or sale even under an acre, this maintenance obligation applies to your site, not just during construction but for as long as the facility remains in place. AQUALIS provides full post-construction stormwater management for property owners across Niagara County, so facilities stay compliant well after a project is finished.

Niagara County properties must maintain proper operation and maintenance of their stormwater facilities through a preventive and corrective maintenance program, supported by written procedures and trained staff. This is meant to be a documented, ongoing commitment rather than occasional or reactive upkeep. AQUALIS develops and manages these preventive and corrective maintenance programs for Niagara County property owners, keeping documentation aligned with the actual maintenance work performed.

If a stormwater facility in Niagara County is not kept in proper working condition, or if required sediment removal and preventive maintenance are neglected, the property owner risks falling out of compliance with the recorded maintenance easement agreement and the broader NYSDEC MS4 permit standards the county operates under. AQUALIS provides non-compliance resolution for Niagara County property owners, correcting maintenance issues before they escalate into a larger compliance problem.

Because Niagara County’s municipalities are MS4 communities, they must maintain an inventory of stormwater practices, including the location of each practice, its type, the maintenance it needs, and the dates and type of maintenance actually performed. Property owners are often the source of this information for facilities on their sites, and gaps in an individual property’s records can create gaps in the municipality’s broader inventory. AQUALIS maintains complete, up to date maintenance records for every property it services in Niagara County, so documentation feeds accurately into the municipal inventory.

If a stormwater facility in Niagara County is not kept in proper working condition, or if required sediment removal and preventive maintenance are neglected, the property owner risks falling out of compliance with the recorded maintenance easement agreement and the broader NYSDEC MS4 permit standards the county operates under. AQUALIS provides non-compliance resolution for Niagara County property owners, correcting maintenance issues before they escalate into a larger compliance problem.

Post-construction stormwater compliance in Niagara County involves a recorded maintenance easement agreement, a documented preventive and corrective maintenance program, sediment removal thresholds, and detailed recordkeeping tied to the municipality’s MS4 inventory. Managing all of this without dedicated stormwater staff is difficult for most property owners. AQUALIS offers complete post-construction stormwater management for Niagara County property owners, covering maintenance, inspections, recordkeeping, and non-compliance resolution, so owners can meet the county’s requirements without managing the process themselves.

The information on this page is provided for general informational purposes only and is not legal advice. Regulations change frequently — AQUALIS makes no warranty as to the accuracy or completeness of this content, and any reliance on it is at your own risk. Consult a qualified professional or your local regulatory authority to confirm requirements applicable to your specific property.

Services Offered in County of Niagara and Surrounding Area

retention pond and grass shore

Stormwater Management

AQUALIS provides comprehensive stormwater services across the United States. From inspection and maintenance to repairs and rehabilitations, AQUALIS manages water on your property so you do not have to.
lift station

Wastewater Management

AQUALIS offers sustainable wastewater solutions including inspection, maintenance and repairs.
Three people reviewing plans

Sustainable Water Engineering

AQUALIS provides sustainable engineering services, in states in which we are licensed, from concept through construction, working closely with our clients to identify and deliver their ideal solutions.
storm drain

Monitoring & Reporting

There are multiple requirements and records that need to be kept from your SWPPP to inspections and depending on your industry, stormwater sampling and analysis.
person holding a beaker

Water Quality Testing

AQUALIS offers water quality testing for stormwater, wastewater and drinking water.

Case Studies

How a Hidden Pipe Failure Created a Sinkhole and Pond Erosion at a Commercial Property in Orange City, Fla. 

Lift Station Overhaul Restores Critical Sewage Infrastructure Tacoma, Wash.

during construction of a new bridge in fox point, wisconsin

Green Infrastructure Protects Bridges in Fox Point, Wis.

Severe erosion threatened twin bridges spanning a ravine overlooking Lake Michigan. AQUALIS combined green and gray infrastructure to stabilize the slopes and protect critical infrastructure.

Comprehensive Lift Station Overhaul Restores Sanitary Service at Industrial Facility in Mount Vernon, Wash. 

After years of continuous service, an industrial facility's sanitary lift station had reached the end of its serviceable life. AQUALIS executed a full overhaul, replacing the pumps, plumbing, controls and in-well hardware to return the station to reliable, code-compliant operation.
Muffin Monster installation

Sanitary Lift Station Grinder Installation and System Reliability Improvement in Katy, Texas

AQUALIS addressed recurring sanitary lift station failures at a retail facility in Katy, TX, by identifying the upstream solids issue driving repeated emergency callouts. The project included installation of an inline Muffin Monster grinder, controls integration and full site restoration to improve system reliability and reduce reactive maintenance.
cut pipes laying in a parking lot

Parking Lot Sinkhole Leads to Underground Pipeline Reconstruction in Springfield, Va.

A large sinkhole at a commercial property in Springfield, Virginia led to full reconstruction of the site’s underground stormwater detention system. AQUALIS managed the phased demolition, geotechnical evaluation, utility coordination and installation to restore long-term stability and performance.
new catch basin

Manhole Root Intrusion Repair and System Assessment in Miami, Fla.

Sediment buildup, buried structures and root intrusion prompted a Miami shopping center to partner with AQUALIS to inspect, clean and restore key components of its stormwater system
uv light entering pipe

How Stormwater Pipe Inspection & UV Rehabilitation Restored Flow in New Bern, N.C.

A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.
new riprap for a pond

Facility Pond Shoreline Stabilization Addresses Erosion in Findlay, Ohio

Years of erosion driven by fluctuating pond levels and site runoff led to shoreline damage across this distribution property. AQUALIS implemented targeted repairs to stabilize the pond and restore stormwater control.
retention pond

Fixing Pond Erosion to Restore and Improve Stormwater Function in Mebane, N.C.

The customer requested maintenance of stormwater management principles located on the property. Lack of routine preventive maintenance had caused overgrowth, leading to insufficient stormwater systems.
inside of a lift station

Upgrading Failing Lift Stations to Restore Stormwater Flow in Peru, Ind.

The three lift stations on this property had not been serviced in several years and were showing signs of deterioration. The property owner contacted AQUALIS to perform a full inspection and recommend repairs to restore reliable operation and prevent future system failures.
pond after stormwater repairs

Stormwater Repairs Ensure Regulatory Compliance in Charlotte, N.C.

Learn how AQUALIS completed stormwater system restoration ahead of a compliance audit, ensuring the property met regulatory standards and was fully prepared for inspection.