City of Naperville / County of DuPage

At AQUALIS, we know Naperville / County of DuPage's sustainable water compliance standards and manage regulator relations for our clients.

It is our mission to help you become compliant with these stormwater, wastewater and drinking water regulations through inspections, maintenance, repairs and rehabilitation services. As your water compliance provider, we handle the regulatory guidelines specific to Naperville / County of DuPage and ensure that our services meet the highest compliant procedures to keep you in compliance with local regulators.

Last Updated 08/12/2026

Excerpt from Stormwater Management Plan

Federal environmental regulations based on the 1972 Clean Water Act (CWA) require that MS4s, construction sites and industrial activities control polluted stormwater runoff from entering receiving bodies of water (including navigable streams and lakes). The NPDES permit process regulates the discharge from these sources based on amendments to CWA in 1987 and the subsequent 1990 and 1999 regulations by the U.S. Environmental Protection Agency (USEPA). In Illinois, the USEPA has delegated administration of the Federal NDPES program to the Illinois Environmental Protection Agency (IEPA). On December 20, 1999 the IEPA issued a general NPDES Phase II permit for all MS4s. The General Permit is included in Appendix 5.13. Under the General ILR 40 Permit each MS4 was required to submit a Notice of Intent (NOI) declaring compliance with the conditions of the permit by March 10, 2003. The original NOI describes the proposed activities and best management practices that occurred over the original 5-year period toward the ultimate goal of developing a compliant SMPP. At the end of the 5 th year (March 1, 2008) the components of the SMPP were required to be implemented; per the ILR40 permit. The IEPA reissued the ILR 40 permit on April 1, 2009.

Additionally, under the General ILR10 permit also administered IEPA, all construction projects that disturb greater than 1 acre of total land area are required to obtain an NPDES permit from IEPA prior to the start of 9 | P a g e City of Naperville construction. Municipalities covered by the General ILR40 permit, are automatically covered under ILR10 30 days after the IEPA receives the NOI from the municipality

Excerpt from Stormwater Ordinance

ARTICLE XIV. – PROHIBITED ACTS/ENFORCEMENT/PENALTIES

A. It shall be unlawful for any person to undertake any development within the County or within a waiver community without first securing a stormwater management certification as required by this chapter or the applicable waiver community ordinance.

B. It shall be unlawful for any person to violate, disobey, omit, neglect, or refuse to comply with, or to resist enforcement of, any provision of this chapter, or an applicable waiver community ordinance, or any condition of any stormwater management certification or variance required by this chapter, or a waiver community ordinance.

C. It shall be unlawful for the person owning or exercising control over any property, or development thereon, to permit or allow that property, or any development thereon, or any condition thereof, to violate, or remain in violation of, any provision of this chapter, or a waiver community ordinance, or fail to comply with, abide by or satisfactorily complete any condition of any stormwater management certification or variance granted to, or issued for, that property or development.

D. It shall be unlawful for any person to continue any work on a property after having been served with a stop work order issued pursuant to section 15-108, except such work as that person is directed, or authorized, to perform by the Director or Administrator necessary to remove a violation having a temporary impact or to abate an unsafe condition.

(Ord. No. OSM-001-13, 4-23-2013)

Upon finding the existence of any violation of this chapter or a waiver community ordinance, the Director or the Administrator shall have the authority and duty to take or direct all actions necessary or appropriate to abate and redress such violation. The Director or the Administrator shall also initiate proceedings, as necessary, to enforce this chapter or the waiver community ordinance. A code enforcement adjudication program may be used to prosecute violations of this chapter, or a waiver community ordinance.

(Ord. No. OSM-001-13, 4-23-2013)

A. Whenever the Director or the Administrator determines that a violation of this chapter exists, the Director or the Administrator shall issue a notice of violation in any of the following manner:

1. By posting a copy on the subject property in a conspicuous place; or

2. By personally delivering or mailing a copy to the person, firm, or corporation responsible for the unlawful act or omission or condition which forms the basis for the violation; or

3. By personally delivering or mailing a copy to any adult who resides at, occupies, uses, leases, manages or maintains the property on which the violation is located; or

4. By personally delivering or mailing a notice of violation to any owner in title to the property on which the violation is located.

B. If a notice, or order, is issued in accordance with section 15-104.A.1 or if the party to whom the notice of violation was issued was in accordance with section 15-104.A.2 or 15-104.A.3 is not also the property owner, a copy of the notice shall also be mailed to the “owner of record” as indicated on the latest tax assessor’s records at the last address to which a tax bill was mailed.

C. A notice of violation shall contain the following:

1. A brief statement setting forth the type and nature of the violation; and

2. The section, or sections, of this chapter violated and, if applicable, the identity of any order, permit, plan or statement of specifications violated; and

3. The date the violation was observed; and

4. The address and/or PIN of the property on which the violation was observed; and

5. A statement directing the discontinuance of the illegal action or condition and abatement of the violation; and

6. A statement informing the violator, and/or owner, that they may contest the notice of violation by requesting in writing and within fourteen (14) days of issuance of the notice, an administrative appeal; and

7. A statement informing the violator, and/or owner, that they may correct the violation within fourteen (14) days. A violator may remedy the violation by either;

a. Correcting, abating or removing the violation, or the condition(s) which cause the violation, and have such remediation verified by an inspection; or

b. Applying to the county, or waiver community, for any necessary certification (s), or to revise or amend any previously issued certification, or revise or amend any previously approved plan, drawing or specifications, as applicable.

8. A warning that if the violator fails to comply with this chapter and remedy the violation within the time specified the County, or waiver community, shall institute appropriate legal proceedings against the violator.

9. A statement that this chapter authorizes fines of up to one thousand dollars ($1,000.00), per day, for each day a violation remains uncorrected, plus additional court costs, which fines and costs may be assessed in addition to other remedies at law including a court order enjoining further violations and ordering the offender to cease, correct, repair, abate or otherwise remedy the offending condition.

D. If a party to which a notice of violation has been issued requests an extension of time to comply with this chapter, or perform any act necessary to remedy a violation, the Director or Administrator may allow an extension of time for such compliance or act, which extension shall not be more than forty-five (45) days. The Director or Administrator shall not extend the period of time in which a party may request an administrative hearing

E. The issuance of a notice of violation shall not be required as a condition of the County, or a waiver community, commencing legal action to enforce a stop work order issued pursuant to section 15-108, or where the a violation presents an imminent risk of harm to the health, life or safety of any person, or an injunctive suit brought pursuant to section 15-111.

(Ord. No. OSM-001-13, 4-23-2013)

A. Pursuant to the authority granted by 55 ILCS 5/5-1104 & 5-1062, the County may, after thirty (30) days written notice to the owner or occupant, in a non-emergency situation enter upon any lands or waters within the County for the purpose of inspecting or maintaining stormwater facilities or causing the removal of any obstruction to an affected watercourse.

B. The Director or the Administrator shall post the notice in a prominent place on the premises, or shall send by certified mailing a copy of the notice to the property owner listed in the County property tax records. The notice shall:

1. State the method by which the stormwater facility will be cleaned or maintained; and

2. State the date upon which the proposed work will begin; and

3. Inform the property owner that the property owner may appeal the commencement date of the proposed maintenance work.

C. Where an obstruction is within a water course and is obstructing flow, the County or a waiver community may, with ten (10) days notice, enter upon the property and remove the obstruction.

(Ord. No. OSM-001-13, 4-23-2013)

Whenever the Director or Administrator determines that a violation has a temporary impact to a flood plain, wetland, buffer or PCBMP, which may be corrected, abated, or removed, in whole or in part, or where the adverse effects of the violation can be ameliorated by immediate action, the Director or Administrator may authorize the violator, in writing, to perform remedial action at the violation site without certification:

A. Unauthorized wetland impacts that are intended to be permanent are required to proceed through the normal stormwater management certification process to determine if the impact will be allowed to remain; or

B. Remedial action may include, as the Director or Administrator deems appropriate for the situation, the following:

1. Removal of fill or other materials from the impacted area; and

2. The area, and/or volume of fill or material removal, the manner of such removal and method of disposal for such fill or material; and

3. A restoration and/or mitigation plan for the impacted area setting forth performance standards, management and monitoring requirements as necessary, and implementation schedule.

C. When the Director or Administrator authorizes remedial action under this section, such remedial acts shall:

1. Focus of the restoration of floristic communities and function of the impacted area; and

2. Undergo a minimum of one year of management and monitoring, when applicable, to verify successful restoration. Failure to achieve the performance standards established as part of a restoration or mitigation plan shall result in additional years of management and monitoring being required.

D. In all cases the Director or Administrator shall document the nature of violation and the basis for his determination that the impact was temporary.

(Ord. No. OSM-001-13, 4-23-2013)

A. The director or the administrator may revoke a stormwater management certification under any of the following circumstances:

1. When the application, plans, or other supporting documents submitted by the applicant reflect a false statement or misrepresentation as to material fact; or

2. The development violates any relevant local, state, or federal requirement.

3. When the security, access rights or covenants posted by the certification holder do not comply with the requirements of this chapter, or a waiver community ordinance.

(Ord. No. OSM-001-13, 4-23-2013)

A. The Director or the Administrator, upon discovery of the existence of any of the circumstances established in subsection 15-107.A.2. of this chapter, is authorized to issue an order requiring the suspension of the subject development. Such stop-work order shall be in writing, shall indicate the reason for its issuance, and shall order the act(s), if any, necessary to resolve the circumstances requiring the stop-work order.

B. A stop-work order shall be issued when:

1. Development is proceeding in a manner which creates imminent hazard of severe harm to persons or property on or off the site; or

2. Development has been accomplished in violation of a requirement of this chapter, or the waiver community ordinance, or a stormwater management certification, or any other applicable law or regulation, and a period of longer than fifteen (15) calendar days has elapsed since written notice of the violation or noncompliance was issued and the violation or noncompliance has not been corrected, abated or rectified; or

3. Development for which a stormwater management certification is required is proceeding without issuance of a stormwater management certification. In such instance, the stop-work order shall indicate that the effect of the order terminates when the required stormwater management certification is properly obtained.

C. If the director or administrator discovers that work on any property is being conducted contrary to the provisions of this chapter, or in an unsafe and dangerous manner, such work shall be immediately stopped. The stop work order shall be in writing and shall be given to the owner of the property involved, to the owner’s agent, to the person doing the work, or posted on the subject property; and shall state the appropriate code section(s) in violation.

D. Upon receipt of a stop work order, the property owner has fourteen (14) days to resolve the violation or apply for a stormwater management certification. Failure to comply within this timeframe may result in prosecution and/or fines as outlined in section 15-109.

(Ord. No. OSM-001-13, 4-23-2013)

A. Any person who violates, disobeys, omits, neglects, refuses to comply with, or resists enforcement of any provision of this chapter, the applicable waiver community ordinance, or any condition in any certification issued pursuant to this chapter or a waiver community ordinance, shall be subject to a fine not less than one hundred dollars ($100.00) nor in excess of one thousand dollars ($1,000.00) for each offense. Each calendar day a violation continues to exist shall constitute a separate offense.

B. For the purposes of this section 15-109, the owner, any occupant, the developer, and/or any contractor doing development work on the land shall be jointly and severally liable for any violation of this chapter or the waiver community ordinance.

C. The committee, or in a complete waiver community the oversight committee, shall request its appropriate legal counsel to prosecute such action as a petty offense pursuant to 730 ILCS 5/5-1-17 (1992); as hereafter amended; or according to other appropriate authority in law or in equity.

View State Page

Frequently Asked Questions

Yes. Undertaking any development within DuPage County, or a waiver community like Naperville, without first securing a stormwater management certification is unlawful under the county’s ordinance. That requirement sits on top of Naperville’s own construction permitting process, which won’t issue a permit without a plan to manage runoff generated during construction itself.

The notice goes out by posting a copy on the property in a conspicuous place, personally delivering or mailing it to the responsible party, or mailing it to the owner of record on file with the tax assessor. Whichever method applies, the notice has to spell out the nature of the violation, the specific code section violated, the date it was observed and a clear directive to correct it. The property owner then has 14 days to either fix the violation or request an administrative appeal.

Generally, only after 30 days written notice for routine, non-emergency inspection or maintenance work, and that notice has to state how the work will be done, when it starts, and that the owner can appeal the start date. If an obstruction is actively blocking flow within a watercourse, though, the county can act with just 10 days notice instead of the standard 30.

A few specific situations: development proceeding in a way that creates imminent hazard to people or property, work continuing more than 15 days after a violation notice without correction, or work proceeding on a project that required a stormwater management certification but never obtained one. Once a stop work order issues, the property owner has 14 days to resolve the violation or apply for the required certification before facing prosecution or fines.

Fines range from $100 to $1,000 per offense, and each calendar day a violation continues counts as a separate offense, on top of authorized fines of up to $1,000 per day specifically tied to notice-of-violation non-compliance. The property owner, any occupant, the developer and any contractor performing the work can all be held jointly and severally liable, so responsibility doesn’t rest with just one party if multiple people had a hand in the violation.

Not necessarily, if the county director or administrator determines the impact is temporary and correctable. In that case, the violator can be authorized to perform remedial action without going through certification, which might include removing fill material or completing a restoration plan. That remedial work then has to undergo at least a year of management and monitoring to confirm the restoration actually succeeded, and failing to meet performance standards can extend that monitoring period further.

The information on this page is provided for general informational purposes only and is not legal advice. Regulations change frequently — AQUALIS makes no warranty as to the accuracy or completeness of this content, and any reliance on it is at your own risk. Consult a qualified professional or your local regulatory authority to confirm requirements applicable to your specific property.

Services Offered in City of Naperville / County of DuPage and Surrounding Area

retention pond and grass shore

Stormwater Management

AQUALIS provides comprehensive stormwater services across the United States. From inspection and maintenance to repairs and rehabilitations, AQUALIS manages water on your property so you do not have to.
lift station

Wastewater Management

AQUALIS offers sustainable wastewater solutions including inspection, maintenance and repairs.
Three people reviewing plans

Sustainable Water Engineering

AQUALIS provides sustainable engineering services, in states in which we are licensed, from concept through construction, working closely with our clients to identify and deliver their ideal solutions.
storm drain

Monitoring & Reporting

There are multiple requirements and records that need to be kept from your SWPPP to inspections and depending on your industry, stormwater sampling and analysis.
person holding a beaker

Water Quality Testing

AQUALIS offers water quality testing for stormwater, wastewater and drinking water.

Case Studies

during construction of a new bridge in fox point, wisconsin

Green Infrastructure Protects Bridges in Fox Point, Wis.

Severe erosion threatened twin bridges spanning a ravine overlooking Lake Michigan. AQUALIS combined green and gray infrastructure to stabilize the slopes and protect critical infrastructure.

Comprehensive Lift Station Overhaul Restores Sanitary Service at Industrial Facility in Mount Vernon, Wash. 

After years of continuous service, an industrial facility's sanitary lift station had reached the end of its serviceable life. AQUALIS executed a full overhaul, replacing the pumps, plumbing, controls and in-well hardware to return the station to reliable, code-compliant operation.
Muffin Monster installation

Sanitary Lift Station Grinder Installation and System Reliability Improvement in Katy, Texas

AQUALIS addressed recurring sanitary lift station failures at a retail facility in Katy, TX, by identifying the upstream solids issue driving repeated emergency callouts. The project included installation of an inline Muffin Monster grinder, controls integration and full site restoration to improve system reliability and reduce reactive maintenance.
cut pipes laying in a parking lot

Parking Lot Sinkhole Leads to Underground Pipeline Reconstruction in Springfield, Va.

A large sinkhole at a commercial property in Springfield, Virginia led to full reconstruction of the site’s underground stormwater detention system. AQUALIS managed the phased demolition, geotechnical evaluation, utility coordination and installation to restore long-term stability and performance.
new catch basin

Manhole Root Intrusion Repair and System Assessment in Miami, Fla.

Sediment buildup, buried structures and root intrusion prompted a Miami shopping center to partner with AQUALIS to inspect, clean and restore key components of its stormwater system
uv light entering pipe

How Stormwater Pipe Inspection & UV Rehabilitation Restored Flow in New Bern, N.C.

A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.
new riprap for a pond

Facility Pond Shoreline Stabilization Addresses Erosion in Findlay, Ohio

Years of erosion driven by fluctuating pond levels and site runoff led to shoreline damage across this distribution property. AQUALIS implemented targeted repairs to stabilize the pond and restore stormwater control.
retention pond

Fixing Pond Erosion to Restore and Improve Stormwater Function in Mebane, N.C.

The customer requested maintenance of stormwater management principles located on the property. Lack of routine preventive maintenance had caused overgrowth, leading to insufficient stormwater systems.
inside of a lift station

Upgrading Failing Lift Stations to Restore Stormwater Flow in Peru, Ind.

The three lift stations on this property had not been serviced in several years and were showing signs of deterioration. The property owner contacted AQUALIS to perform a full inspection and recommend repairs to restore reliable operation and prevent future system failures.
pond after stormwater repairs

Stormwater Repairs Ensure Regulatory Compliance in Charlotte, N.C.

Learn how AQUALIS completed stormwater system restoration ahead of a compliance audit, ensuring the property met regulatory standards and was fully prepared for inspection.
AQUALIS employee removing the old valve

Gate Valve Replacement Improves Stormwater Flow Control in Durham, N.C.

Learn how AQUALIS helped a high-traffic commercial property stay in compliance by replacing a critical stormwater valve, preventing costly backups and ensuring system functionality.
tape measurer in underground detention system

Restoring Underground Detention Systems to Prevent Flooding in Morrisville, N.C.

AQUALIS restored stormwater systems at a restaurant after city inspections revealed deficiencies. The team ensured proper drainage, improved water quality and regulatory compliance.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.