Did you receive a Notice of Violation (NOV)? Contact AQUALIS today to learn how to resolve the issue.

Back to Compliance
Hawaii Local Compliance

City of Honolulu / County of Honolulu

At AQUALIS, we know Honolulu / County of Honolulu's sustainable water compliance standards and manage regulator relations for our clients.

It is our mission to help you become compliant with these stormwater, wastewater and drinking water regulations through inspections, maintenance, repairs and rehabilitation services. As your water compliance provider, we handle the regulatory guidelines specific to Honolulu / County of Honolulu and ensure that our services meet the highest compliant procedures to keep you in compliance with local regulators.

Last Updated 08/11/2026

Honolulu Stormwater Laws & Regulations

The City and County of Honolulu regulations are compliant with the National Pollutant Discharge and Elimination System (NPDES) permit requirements for the Municipal Separate Storm Sewer System (MS4) under NPDES Permit no. HI S000002. The Storm Water Quality Branch of the Department of Facility Maintenance administers the permitting and compliance program in the city and county of Honolulu. All projects are required to have an Erosion and Sediment Control Plan (ESCP) approved by the Director of the Department of Facility Maintenance before any development occurs.

The Rules Relating to Water Quality apply to all Development and Land Disturbing Activities within the City and County of Honolulu and establish minimum requirements for the selection, design, implementation and maintenance of best management practices (“BMPs”) to protect the MS4 and Receiving Waters from Pollutants that are associated with land disturbance, surface hardening, and land use activities. The pollutants of concern (“POC”) addressed by these Rules include, but are not limited to, sediment, nutrients, trash, pathogens, pesticides, oil, grease, hazardous waste, toxic waste, metals, and organic compounds. The standards and requirements established by these Rules are not a maximum limit to the design requirements for BMPs. Compliance with the minimum requirements and standards established by these Rules does not guarantee that selected BMPs will meet their pollution control and/or drainage objectives. Land owners, design professionals, developers, and contractors are encouraged to implement BMPs that go beyond that requirements of these Rules and seek the advice of other agencies that are responsible for water quality, pollution control, Receiving Waters, water rights, flood plains, and storm water. Compliance with these rules does not excuse violations of State or Federal law, City Ordinances, or permits issued by Department of Planning and Permitting or other permitting authorities.

Violations involving the failure to effectively prevent Pollutant Discharges to the MS4 or Receiving Waters and violations involving the failure to properly use or maintain Permanent BMPs may be enforced by the Director of the Department of Facility Maintenance.

The owner of Real property located within the City and County of Honolulu is absolutely responsible for compliance with these rules and shall be held liable for any violations occurring on, or, arising from, their property. In addition, the Director [of the Department of Facility Maintenance] may hold any person that causes, contributes to, or fails to prevent a violation of these Rules responsible for the violation and any penalties for the same. Where more than one person is deemed responsible for a violation, the Director may cite and penalize each responsible person separately or hold one or more responsible parties jointly and severally responsible for the violation and penalty.

(a) Trenching Permit Projects. Development that requires a trenching permit but does not require a building, grading, grubbing, or stockpiling permit.

(b) Category 1A Projects. Development that requires a building permit but does not require a grading, grubbing, or stockpiling permit shall be classified as a Category 1A Project if it meets all of the following criteria: (1) Residential single-family or two-family detached Development; (2) The total Disturbed Area for the Project is less than 1,000 square feet; and (3) Land Disturbing activities will not occur on slopes equal to or greater than 15 percent at the Site.

(c) Category 1B Projects. Development with less than one acre of Disturbed Area that requires a building permit but does not require a grading, grubbing, or stockpiling permit and does not meet the Category 1A Project criteria shall be classified as a Category 1B Project. -11-

(d) Category 1C Projects. Development that requires a building permit but is not required to obtain a grading, grubbing, or stockpiling permit shall be classified as a Category 1C Project if it involves a Disturbed Area of one acre or more or requires a NPDES General/ Individual Permit Authorizing Discharges of Storm Water Associated with Construction Activity, issued by the DOH.

(e) Category 2 Projects. Development requiring a grading, grubbing, or stockpiling permit shall be classified as a Category 2 Project if the area of the zoning lot or portion thereof subject to the permit is less than 15,000 square feet for single-family or two-family dwelling uses and less than 7,500 square feet for other uses.

(f) Category 3 Projects. Development requiring a grading, grubbing, or stockpiling permit shall be classified as a Category 3 Project if the area of the zoning lot or portion thereof subject to the permit is 15,000 square feet or more for single-family or two-family dwelling uses, or 7,500 square feet or more for other uses, but where the total area graded or stockpiled upon is less than 15,000 square feet for single-family or two-family dwellings uses and less than 7,500 square feet for other uses.

(g) Category 4 Projects. Development requiring a grading, grubbing, or stockpiling permit shall be classified as a Category 4 Project if the total area including any areas developed incrementally that is to be graded, grubbed, or stockpiled upon is 15,000 square feet or more for single-family or two-family dwelling uses, or 7,500 square feet or more for other uses, or in the event a proposed cut or fill is greater than 15 feet in height for single-family or two-family dwelling uses, or 7.5 feet in height for other uses.

(h) Category 5 Projects. Development requiring a grading, grubbing, or stockpiling permit shall be classified as a Category 5 Project if it involves a Disturbed Area of one acre or more and which require a NPDES General/Individual Permit Authorizing Discharges of Storm Water Associated with Construction Activity issued by the DOH.

View State Page

Frequently Asked Questions

The Storm Water Quality Branch within the Department of Facility Maintenance administers the city and county’s permitting and compliance program, operating under NPDES Permit No. HI S000002 for the municipal separate storm sewer system. Every project has to secure an Erosion and Sediment Control Plan approved by the Department’s Director before any development activity begins.

The classification hinges mostly on disturbed area and permit type. A small residential build under 1,000 square feet of disturbance on gentle slopes falls under the lightest category, while anything with a disturbed area of an acre or more, or one that needs an NPDES permit for construction discharges, lands in the most heavily regulated categories. Projects requiring grading, grubbing or stockpiling permits get sorted by lot size, with the threshold set at 15,000 square feet for single-family or two-family uses and 7,500 square feet for everything else. Knowing which category a project falls into early shapes exactly what permitting and BMP requirements apply.

The property owner is absolutely responsible for compliance, regardless of who actually caused the violation, and can be held liable for anything occurring on or arising from their land. The Director of the Department of Facility Maintenance can also pursue any other person who caused, contributed to or failed to prevent a violation, and where multiple parties share responsibility, the Director can penalize each one separately or hold them jointly and severally liable.

Not automatically. The city’s Rules Relating to Water Quality are explicit that meeting the minimum requirements doesn’t guarantee a selected BMP will actually achieve its pollution control or drainage objectives, and compliance with these rules doesn’t excuse violations of separate state, federal or other permitting requirements. Property owners, designers and contractors are specifically encouraged to exceed the minimum standards rather than treat them as a ceiling, which is a more demanding posture than most jurisdictions’ language around BMP compliance.

The information on this page is provided for general informational purposes only and is not legal advice. Regulations change frequently — AQUALIS makes no warranty as to the accuracy or completeness of this content, and any reliance on it is at your own risk. Consult a qualified professional or your local regulatory authority to confirm requirements applicable to your specific property.

Services Offered in City of Honolulu / County of Honolulu and Surrounding Area

retention pond and grass shore

Stormwater Management

AQUALIS provides comprehensive stormwater services across the United States. From inspection and maintenance to repairs and rehabilitations, AQUALIS manages water on your property so you do not have to.
lift station

Wastewater Management

AQUALIS offers sustainable wastewater solutions including inspection, maintenance and repairs.
Three people reviewing plans

Sustainable Water Engineering

AQUALIS provides sustainable engineering services, in states in which we are licensed, from concept through construction, working closely with our clients to identify and deliver their ideal solutions.
storm drain

Monitoring & Reporting

There are multiple requirements and records that need to be kept from your SWPPP to inspections and depending on your industry, stormwater sampling and analysis.
person holding a beaker

Water Quality Testing

AQUALIS offers water quality testing for stormwater, wastewater and drinking water.

Case Studies

How a Hidden Pipe Failure Created a Sinkhole and Pond Erosion at a Commercial Property in Orange City, Fla. 

Lift Station Overhaul Restores Critical Sewage Infrastructure Tacoma, Wash.

during construction of a new bridge in fox point, wisconsin

Green Infrastructure Protects Bridges in Fox Point, Wis.

Severe erosion threatened twin bridges spanning a ravine overlooking Lake Michigan. AQUALIS combined green and gray infrastructure to stabilize the slopes and protect critical infrastructure.

Comprehensive Lift Station Overhaul Restores Sanitary Service at Industrial Facility in Mount Vernon, Wash. 

After years of continuous service, an industrial facility's sanitary lift station had reached the end of its serviceable life. AQUALIS executed a full overhaul, replacing the pumps, plumbing, controls and in-well hardware to return the station to reliable, code-compliant operation.
Muffin Monster installation

Sanitary Lift Station Grinder Installation and System Reliability Improvement in Katy, Texas

AQUALIS addressed recurring sanitary lift station failures at a retail facility in Katy, TX, by identifying the upstream solids issue driving repeated emergency callouts. The project included installation of an inline Muffin Monster grinder, controls integration and full site restoration to improve system reliability and reduce reactive maintenance.
cut pipes laying in a parking lot

Parking Lot Sinkhole Leads to Underground Pipeline Reconstruction in Springfield, Va.

A large sinkhole at a commercial property in Springfield, Virginia led to full reconstruction of the site’s underground stormwater detention system. AQUALIS managed the phased demolition, geotechnical evaluation, utility coordination and installation to restore long-term stability and performance.
new catch basin

Manhole Root Intrusion Repair and System Assessment in Miami, Fla.

Sediment buildup, buried structures and root intrusion prompted a Miami shopping center to partner with AQUALIS to inspect, clean and restore key components of its stormwater system
uv light entering pipe

How Stormwater Pipe Inspection & UV Rehabilitation Restored Flow in New Bern, N.C.

A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.
new riprap for a pond

Facility Pond Shoreline Stabilization Addresses Erosion in Findlay, Ohio

Years of erosion driven by fluctuating pond levels and site runoff led to shoreline damage across this distribution property. AQUALIS implemented targeted repairs to stabilize the pond and restore stormwater control.
retention pond

Fixing Pond Erosion to Restore and Improve Stormwater Function in Mebane, N.C.

The customer requested maintenance of stormwater management principles located on the property. Lack of routine preventive maintenance had caused overgrowth, leading to insufficient stormwater systems.
inside of a lift station

Upgrading Failing Lift Stations to Restore Stormwater Flow in Peru, Ind.

The three lift stations on this property had not been serviced in several years and were showing signs of deterioration. The property owner contacted AQUALIS to perform a full inspection and recommend repairs to restore reliable operation and prevent future system failures.
pond after stormwater repairs

Stormwater Repairs Ensure Regulatory Compliance in Charlotte, N.C.

Learn how AQUALIS completed stormwater system restoration ahead of a compliance audit, ensuring the property met regulatory standards and was fully prepared for inspection.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.